Fermi America LLC (dba Fermi America); Project Matador Advanced Energy and Intelligence Campus AP1000 Units 1-4; Project Matador Nuclear Units 1-4; Draft Environmental Impact Statement

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Environmental Impact Statement (EIS). The draft EIS is in response to a Combined License (COL) application submitted by Fermi America for the proposed construction and operation of four AP1000 advanced passive pressurized-water reactors–designated as Project Matador Nuclear Units 1-4 (PMN Units 1-4). PMN Units 1-4 would be located at the Project Matador Advanced Energy and Intelligence Campus (Project Matador campus). The draft EIS evaluates the environmental impacts of the proposed action of issuing a COL that would allow the construction of PMN Units 1-4, as well as the environmental impacts of the no-action alternative (i.e., denying the COL application).